|
Submarine Fiber Optic Cable
• Route survey for the cable, and Near Shore protection.
• Shore End Cable Landing operations.
• Cable Laying, Trenching and Burial work.
• Mattress laying for near shore protection.
• Articulated (Split Pipe) installation.
• Cable Pinning operations.
• Pre & Post lay CCTV Survey.
• Cable Burial using U/W Trenching System. |
|
|
|
|
|
|